Dies

We make extrusion dies for aluminium profiles

Designed and made to your drawing at our production site in China and delivered to your plant turnkey.

  • Solid, hollow and multi-cavity
  • For your press tonnage and container diameter
  • Repeat orders from stored drawings
  • Rework and modification of existing dies
Die polishing at our production site
  • 14-15 daysusually from drawing to Moscow
  • H13 steelvacuum hardening and nitriding
  • Die drawingagreed with you before production

From drawing to your plant

The path of a die from design to your plant: 6 stages, 18 steps on the picture. Pick a stage to see what happens at it and how long it takes.

Usually 14-15 days from drawing to Moscow. Complex and large dies get an individual lead time

Stage 1/6

Drawing and design

We start from your profile drawing and your press data.

Lead time: counted from prepayment and approval of the die drawing

Get a die quote

Our designer develops the die for your press from your profile drawing, and we send you the die drawing for approval.

What we do

  • Profile drawing and tolerances checked
  • Die size matched to the press and container
  • Ports and bearings calculated
  • Die drawing sent for approval

Stage 2/6

Die production

We make the die at our production site in China: from an H13 steel blank to a packed crate. Pick a step in the list to find it on the picture.

Lead time: usually about 10 days; complex and large dies get an individual lead time

Get a die quote

How it goes

  1. H13 steel blankA blank of the required thickness, with machining allowance, is cut from a forged bar of H13 hot work tool steel.
  2. TurningA CNC lathe machines the outer diameter, faces, chamfers and the fit for the die ring.
  3. CNC millingA machining centre cuts the ports, pockets and bridges of a hollow die and the holes for dowels and bolts.
  4. Vacuum hardeningThe die is hardened in a vacuum furnace and tempered several times, so the steel reaches working hardness without scale or distortion.
  5. Wire EDMThe die opening is cut along the profile contour by wire EDM: accurate walls and sharp corners without stressing the steel.
  6. Sinker EDMGraphite or copper electrodes sink the pockets, steps and bearings that a milling cutter cannot make.
  7. Bearing polishingThe bearings are polished by hand: the profile surface and the die life depend on their finish.
  8. NitridingIn a pit furnace the die surface is enriched with nitrogen: a hard layer protects the bearings from wear.
  9. InspectionBefore shipment we check the opening and bearing dimensions, hardness and marking, photograph the die and send you a report.
  10. PackingThe die is coated with corrosion inhibitor, wrapped in film, packed into a wooden crate and weighed, and the shipping documents are prepared.

Stage 3/6

Delivery in China

From our production site to the airport cargo terminal.

Lead time: 1-2 days

Get a die quote

We collect the crate with the die at our production site and take it to the airport cargo terminal.

What we do

  • We collect the finished crate at our production site
  • We check marking and weight against the documents
  • Our agent in China handles the dispatch
  • We take it to the airport cargo terminal

Stage 4/6

By air to Moscow

The die flies to Moscow on a cargo flight: faster than sea or rail.

Lead time: flight and customs in Moscow together: usually 2-3 days

Get a die quote

How it goes

  1. Cargo terminal in ChinaThe cargo is handed over to the terminal, weighed and cleared for export.
  2. Cargo planeThe die flies to Moscow. Air freight is much faster than sea or rail.
  3. Arrival in MoscowThe plane lands in Moscow; the cargo is received and moved to a bonded warehouse.

Stage 5/6

Customs and bonded warehouse

Our own declarant clears the cargo in Moscow while it waits at a bonded warehouse.

Lead time: included in the 2-3 days with the flight

Get a die quote

Customs clearance is done by our own declarant. Duty and VAT are already in the quoted price.

What we do

  • Our own declarant files the declaration
  • Duty and VAT are already in the quoted price
  • The cargo stays at the bonded warehouse until release

Stage 6/6

Delivery to your plant

From the Moscow warehouse to your shop floor, or pick it up yourself.

Lead time: depends on the city; pick-up from the bonded warehouse is possible

How it goes

  1. Delivery to your plantAfter release we deliver the die to your plant. You can also collect it from the bonded warehouse.
  2. Your plantThe die arrives with VAT and full closing documents from a Russian legal entity.

Send us a drawing or an equipment list

We will calculate the landed price and lead time. Drawings, specifications and photos are welcome.

Dies
a quote with the landed price within 1-2 business days
Equipment
we first agree on the configuration and terms, then send a quote

Contacts

How we can reach you

What you need